More results...

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Search in posts
Search in pages
Filter by Categories
Generally
Mietpartner
offline
German Representative Offices

More results...

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Search in posts
Search in pages
Filter by Categories
Generally
Mietpartner
offline
German Representative Offices

MIETPARTNER LARGE BUILDING DRYER

The large construction dryer Mietpartner is the ideal partner for drying and dehumidifying large rooms and areas. With the large construction dryer you can dry large rooms and objects up to 800m². The large construction dryer achieves a dehumidification capacity of up to 150 l/day and can be easily moved around the construction site thanks to the large transport rollers. A van or station wagon is ideal for transport.

Advantages Mietpartner Large construction dryer:

  • all-terrain transport rollers
  • external water drain
  • highest dehumidification performance in its class
  • only 2.1 kw power consumption per hour
  • dries up to 150 ltr . / day
  • easy construction
  • including hour meter
  • Keeping rooms up to 1,600 m³ dry
  • Increased air performance through extremely robust high-pressure centrifugal fan
  • to be transported standing or lying down
  • ideal for drying after groundwater or flood damage
  • Can be combined with construction fan for more drying performance
  • also suitable for screed drying in a set with the insulation layer dryer
  • we are happy to help with the installation on site

How many construction dryers do I have to rent in order to be able to dry the room optimally?

In order to be able to perfectly coordinate the construction dryer requirement, a number of factors are important. First of all, the size of the room to be dried in m³ is important. Then the existing insulation of the room and the degree of moisture penetration play a role, as does the current room temperature. We will be happy to calculate the exact requirements for your room drying before you rent it. We also recommend an accompanying moisture measurement during the drying process. The right building moisture measuring device can also be rented.

How long does it take to dry the building?

If the needs assessment is correctly calculated and tailored to the conditions to be dried, room drying can and should be completed within a short time of 2-3 weeks. The drying time is longer if the drying water has stood for a longer period of time and the building materials can be soaked through.

Example drying time of freshly laid screed: When laying a screed, approx. 200 ltr . / per m³ of surface area. With a recommended screed thickness of 6 cm , the normal drying time is 8 weeks (plus a rest period) until the flooring is ready for covering. Using construction dryers can shorten this time by up to 50%, significantly reducing the overall construction time. This means the surface covering can be installed more quickly!

WordPress Cookie Plugin by Real Cookie banner